Serbia · Energy and infrastructure · Updated November 2026

Investing in Serbia’s energy sector in 2027: auctions, plans and permits explained

Short answer

Serbia plans about 3.5 GW of new wind and solar by 2030 and wants renewables to supply about 45 % of its electricity by then (national energy and climate plan, July 2024). New wind and solar plants win state support through auctions run by the Ministry of Mining and Energy, with 15-year contracts; the second round in 2025 went to 10 projects totalling 645 MW. Permits, licences and grid connections are decided by Serbian authorities, so each project is judged on its own file.

Not sure which route fits you? Try the Route Finder.

Facts checked 8 November 2026.

645MW won in the 2025 auction
15years, auction contract length
400MWh battery in the EPS solar project
45% renewable electricity target, 2030

What is changing in Serbia’s energy market in 2027?

Coal still produces most of Serbia’s electricity, mainly in plants run by the state utility EPS. Two plans set the direction for the next years.

The Integrated National Energy and Climate Plan, adopted by the Government on 25 July 2024, targets renewables at 33.6 % of all energy use and about 45 % of electricity by 2030, and a 40.3 % cut in greenhouse gases compared with 1990.

The Energy Sector Development Strategy to 2040, adopted by the National Assembly in November 2024, adds more wind and solar, two new pumped-storage hydro plants (Bistrica and Đerdap 3) and an end to coal and oil in heat production.

These are targets, not promises. Projects move at the speed of permits, grid capacity and financing, and rules can change in 2027.

How do Serbia’s renewable energy auctions work?

Large wind and solar plants can compete in state auctions. The winners get a 15-year contract for difference: a set price per megawatt-hour, with the output sold through EPS. The bid caps and the amount of capacity on offer are set by the Ministry of Mining and Energy for each round.

Second auction (results February 2025)WindSolar
Capacity with state support300 MW124.8 MW
Winning projects5 (468 MW planned)5 (177 MW planned)
Winning pricesabout 54 to 68 euros per MWhabout 51 to 59 euros per MWh
Contract length15 years15 years

In total, 41 bids came in, and the 10 winners plan about 782 million euros of investment (Ministry of Mining and Energy results, February 2025). The ministry announces each new round; dates and quotas for 2027 are not set in law.

Which energy areas are open to private investors?

Wind and solar. Through the auctions above, or by selling power under private contracts with buyers. In 2025 Serbia added 134.3 MW of solar.

Battery storage. Needed as more wind and solar join the grid. EPS is working with Hyundai Engineering and UGT Renewables on about 1 GW of solar with a 200 MW / 400 MWh battery, with completion targeted for 2028.

Heating and industry. Cities must move district heating away from coal and oil under the 2040 strategy. Factories also add rooftop solar to cut their own bills.

Big hydro, transmission lines and coal plants stay with the state companies EPS and EMS. Private firms usually join those as contractors or partners. See incentives for foreign investors and doing business in Serbia.

What does a foreign energy investor need in Serbia?

An energy project is judged on paper, and every document has to match:

  • Serbian company (APR register)
  • land ownership or lease
  • grid connection approval
  • energy permit
  • building permit
  • licence, where required
  • bank account and financing

Why it has to be right: the land, the company name and the grid approval must line up across every file. A gap in one can stall the others or a bank loan. In recent cases company registration has taken days, while grid and building approvals have taken months. Each authority sets its own timing and we don’t promise a date.

The free Serbia Relocation Checklist lists what to prepare.

Our company setup service registers your Serbian company, opens the bank account and keeps the books, and our market access support connects you with the right local contacts. You deal with the people who do the work.

Can energy investment lead to Serbian residency or citizenship?

Running a registered company in Serbia is a ground for a temporary residence permit (Law on Foreigners), decided by the Ministry of Interior (MUP). Since 1 February 2024 a permit can last up to three years. See residence permits.

Serbia has no citizenship-by-investment programme. The Law on Citizenship lets the Government admit a foreigner whose admission is of special interest to Serbia, case by case; an investment alone does not qualify you. See citizenship options.

What commonly goes wrong with energy projects in Serbia?

Grid capacity.

The site is good, but the grid nearby cannot take more power yet.

Land and title.

The cadastre shows other owners, farmland limits or a lease too short for the project.

Permits out of order.

One approval expires while another is still pending.

Price risk.

Auction prices are capped; outside an auction, power prices move with the market.

Who decides energy projects in Serbia?

MatterWho decides
Auctions and energy permitsMinistry of Mining and Energy
Energy licencesEnergy Agency of Serbia (AERS)
Grid connectionEMS (transmission) or Elektrodistribucija Srbije
Company registerSerbian Business Registers Agency (APR)
Residence permitsMinistry of Interior (MUP)

Relocation Serbia, in Belgrade and Novi Sad, sets up companies, bank accounts, accounting and residence files for foreign investors across Serbia. Start with the €49 Relocation Roadmap (credited toward any package within 90 days — see pricing).

Frequently asked questions

Is Serbia a good place for energy investment in 2027?

Serbia plans about 3.5 GW of new wind and solar by 2030, and its auctions give winners 15-year contracts. Each project still depends on grid capacity, permits and financing.

How many megawatts did Serbia’s second renewables auction award?

Ten wind and solar projects won, with 645 MW planned in total (Ministry of Mining and Energy, February 2025).

Can a foreign company build a solar or wind plant in Serbia?

Yes. It usually works through a Serbian company and needs land rights, a grid connection approval and the energy and building permits.

Does energy investment give Serbian citizenship in 2027?

No. Serbia has no citizenship-by-investment programme. The Government decides special-interest cases one by one.

Who decides energy permits and licences in Serbia?

The Ministry of Mining and Energy issues energy permits and runs the auctions, and the Energy Agency of Serbia (AERS) issues licences. No agency can promise an outcome.

Updated November 2026 · Relocation Serbia, Belgrade and Novi Sad. General information, not investment advice. Authorities decide every case.